Most homeowners planning a new build or major remodel focus on what their home will look like when it’s complete. Few think about the order in which it gets built—and yet, that order, known as construction sequencing, is one of the biggest determining factors in whether a project runs smoothly or encounters avoidable delays, budget overruns, and structural issues. At Orr Construction Company, sequencing is more than a timeline—it’s a strategy designed to safeguard craftsmanship from the ground up.

Construction sequencing outlines what gets built first, how trades overlap safely, what materials must be ordered in advance, and when inspections and structural elements must be completed. When sequencing is done correctly, every stage supports the next. When it’s neglected, chaos takes over—drywall is installed before plumbing inspections, finishes arrive late, or builders tear open completed work to correct oversights.

Why Sequencing Matters More in Luxury Builds

Luxury homes demand precision—custom millwork, imported materials, specialized systems, and unique layouts. These features require a thoughtful order of operations. Unlike production construction, where standardized plans are replicated, custom building invites complexity. Orr Construction Company ensures the flow of a project matches its design intent, preventing craftsmanship from being rushed or compromised.

Luxury homeowners benefit from proper sequencing because it:

  • Reduces the risk of rework and damage to finished surfaces
  • Prevents material shortages and delays
  • Ensures specialty trades perform work at the proper stage
  • Keeps mechanical, electrical, and plumbing (MEP) integration seamless
  • Protects long-term structural and aesthetic integrity

This approach allows complex designs—such as floating staircases, custom window systems, multi-level outdoor living spaces, and luxury kitchens—to be executed with flawless precision.

Sequencing Begins Long Before the Build Starts

Construction sequencing is not determined once demolition finishes—it begins in the planning and drafting stage. During design development, Orr Construction Company works closely with architects and engineers to identify long-lead materials, structural dependencies, and specialty installations.

Key pre-build sequencing considerations include:

  • When steel or engineered lumber must be ordered to avoid delays
  • How site prep impacts access for heavy machinery
  • Whether exterior work should occur before weather-sensitive interior finishes
  • What inspections must be passed before walls or ceilings are closed
  • When custom items like cabinetry or tile should be fabricated

Because luxury materials often take months to produce, sequencing protects homeowners from the stress of waiting on finishes long after crews are ready to install them.

Overlapping Work Without Sacrificing Quality

Many homeowners assume construction is always linear—one task must be completed entirely before another begins. In reality, efficient sequencing involves strategic overlap. Multiple trades may work simultaneously, but only when the sequencing plan allows it.

For example:

  • Electrical rough-in may begin before structural sheathing is fully complete—but only once framing is far enough along.
  • Exterior stucco or siding may start before interior drywall if moisture-barrier inspections are passed.
  • Landscape work may be delayed until heavy machinery access will no longer be blocked.

At Orr Construction Company, sequencing is curated—never rushed. The result: exceptional craftsmanship delivered through a schedule aligned with high standards.

How Sequencing Protects Your Investment

Building or remodeling a luxury home is a major financial commitment. Poor sequencing is one of the fastest ways to increase costs—often through preventable rework. Every time a wall is reopened, flooring is removed, or custom cabinetry is delayed, the homeowner pays not only in dollars, but in stress and lost time.

A strategic sequencing plan safeguards your investment by:

  • Ensuring critical-path tasks are identified and protected
  • Allowing inspections and approvals to be obtained at the right time
  • Making sure each phase supports the materials and systems installed after it
  • Minimizing damage to finished spaces and materials

It also keeps your team aligned—so you always know what is happening next and why.

Experience a Build That Flows Smoothly from Start to Finish

Construction should feel organized, predictable, and guided—not chaotic. With decades of experience partnering with architects, designers, and the region’s top trades, Orr Construction Company manages construction sequencing at a concierge level—so clients enjoy the process and feel confident every step of the way.