The ADU Construction Process: A Visual and Strategic Guide for Homeowners and Investors

Imagine standing in your backyard, envisioning a cozy granny flat where your aging parents can live independently yet close by, or a sleek rental unit generating steady income to boost your property’s cap rate. Accessory Dwelling Units (ADUs) in California make this vision attainable, thanks to progressive legislation that streamlines their construction. Whether you’re a homeowner fostering multigenerational living or an investor eyeing cost-effective additions cheaper than acquiring new property, building an ADU is a transformative journey. Let’s walk through the process, from demolition to final finishes, across various ADU types—tucked under parking, above garages, carports, and vacant land—while weaving in the practical and financial savvy needed to maximize value.

Step 1: Understanding California’s ADU Legislation

California’s housing crisis has spurred a wave of ADU-friendly laws, making it easier and more affordable to build these units. Key legislation, effective as of 2025, includes:

  • SB 897: Increases height limits for ADUs near transit (up to 18 feet) and eliminates fire sprinkler requirements for primary dwellings when permitting an ADU. It also prohibits denying permits due to nonconforming zoning unless health and safety are at risk.
  • AB 1033: Allows ADUs to be sold separately as condominiums in some cities, enhancing investor flexibility.
  • AB 976: Removes owner-occupancy requirements, enabling investors to build and rent ADUs without living on-site.
  • SB 1211: Permits up to eight detached ADUs on multifamily lots, boosting density for investors.
  • AB 2533: Streamlines permitting for unpermitted ADUs built before 2020, reducing penalties and fees.

These laws, detailed on the California Department of Housing and Community Development (HCD) website, eliminate barriers like minimum lot sizes, excessive setbacks, and replacement parking requirements when converting garages or carports. For credibility, refer to HCD’s ADU Handbook and EZ Plans’ 2025 ADU Laws.

Step 2: Planning and Design

Picture your property: a spacious backyard, a detached garage, or an underutilized carport. The ADU’s design depends on your goals—multigenerational living or rental income—and site constraints. Options include:

  • Tucked Under Parking: A compact ADU nestled beneath a new parking structure, ideal for urban lots with limited space. The parking deck above maximizes land use, offering a modern, multigenerational solution where grandparents live below, and family cars park above.
  • Above Detached Garage: A stylish unit atop a standalone garage, preserving yard space. Its elevated position offers privacy for tenants or young adult children, with rental potential boosting your cap rate.
  • Above Attached Garage: An ADU integrated with the main house’s garage, sharing utilities to save costs. Perfect for a caregiver’s suite or a rental unit, it blends old and new seamlessly.
  • Carport Conversion: Transforming a carport into an ADU by enclosing and upgrading the space. This cost-effective option suits investors seeking quick returns without extensive groundwork.
  • Vacant Land: A detached ADU on unused land, offering flexibility for larger units (up to 1,200 sq. ft.). Ideal for investors building multiple units or families creating a spacious in-law cottage.

Work with an architect or use pre-approved plans from programs like San Jose’s ADU Program to ensure compliance with local codes. Costs range from $100 to $300 per square foot, with conversions (e.g., garages) being cheaper ($50–$200/sq. ft.) than new builds. Prefab units, like those from Perpetual Homes, can further reduce costs, appealing to investors aiming to build for less than acquisition costs of new properties.

Step 3: Demolition and Site Preparation

The process begins with clearing the way. For a carport or garage conversion, demolition is minimal—removing old roofing or non-structural walls. On vacant land or for a new detached ADU, you might clear trees or vegetation, as one Los Angeles investor did, removing an old tree to prepare a flat site.

For tucked-under parking or above-garage ADUs, demolition may involve dismantling parts of an existing structure. Imagine workers carefully removing a carport’s roof, preserving its posts for reuse in the new framework, or demolishing a dilapidated garage to make way for a modern unit above. Permits for demolition, streamlined under SB 897, are issued alongside ADU permits, saving time. A 10–15% contingency budget cushions delays, as seen when a homeowner faced a 30-day wait for a demo permit despite prior removal.

Step 4: Excavation and Foundation

With the site cleared, excavation begins. For a slab-on-grade foundation—common for detached ADUs on flat lots—workers dig trenches for footings (18” wide and deep) and level the ground. Picture laborers hand-digging soft soil, as one homeowner did to save on equipment costs, or machinery carving out space for a tucked-under parking ADU’s deeper foundation.

The foundation type varies:

  • Slab-on-Grade: Cost-effective for vacant land or detached units, reinforced with rebar and wire mesh.
  • Crawl Space or Basement: Used for tucked-under parking, requiring deeper excavation to support parking above.
  • Existing Foundation: Garage conversions often reuse the existing slab, slashing costs for investors.

Concrete is poured into wooden formwork, creating a level base. A vapor barrier prevents moisture issues, and city inspectors verify compliance before backfilling trenches. This stage sets the stage for a durable ADU, whether it’s a cozy family suite or a high-rent tenant space.

Step 5: Framing and Structural Integration

Framing brings the ADU to life. For an attached ADU, workers tie new walls into the main house, perhaps extending the garage’s frame upward for an above-garage unit. Imagine carpenters aligning beams to match the home’s roofline, blending old and new. Detached ADUs or vacant land builds involve erecting standalone frames, while tucked-under parking units integrate structural supports for the parking deck above.

Sheathing panels strengthen walls and roofs, and openings for doors and windows are cut precisely. For garage conversions, existing walls may be reinforced to meet residential codes, especially if near property lines, where fire-rated materials are required. This phase is rapid but critical, ensuring the ADU complies with California’s seismic and safety standards.

Step 6: Utilities and Systems

Utilities breathe functionality into the ADU. For attached units or above-garage ADUs, plumbers and electricians tap into the main house’s systems, saving thousands compared to detached units requiring new lines. Picture pipes snaking through a tucked-under parking ADU’s foundation, connecting to the sewer, or electrical conduits running from the main panel to a new meter for a detached unit.

California law waives separate utility connection fees for conversions, a boon for investors. Solar panels, required for new detached ADUs, can be installed on the primary home or ADU, enhancing sustainability. HVAC systems, tailored to the unit’s size, ensure comfort for tenants or family. This stage, often 40–60% of costs, demands skilled labor but maximizes long-term value.

Step 7: Exterior and Interior Finishes

The ADU takes shape with exterior finishes—siding, roofing, and windows—transforming it into a charming addition. Imagine a detached ADU with cedar siding blending into a lush backyard, or a garage conversion with sleek, fire-resistant stucco near a property line. Investors opt for durable, low-maintenance materials to boost appeal and reduce upkeep costs.

Inside, drywall, flooring, and cabinetry create a welcoming space. Picture a multigenerational family’s ADU with warm hardwood floors, a compact kitchen for grandkids’ baking sessions, and a bathroom designed for accessibility. Investors might choose luxury vinyl planks and quartz countertops to attract high-paying tenants, increasing rental income by $1,500–$3,000/month for a 600–1,200 sq. ft. unit. Final inspections ensure code compliance, from electrical to plumbing, before occupancy.

Step 8: Financial and Investment Benefits

ADUs are a financial win. Construction costs ($75,000–$250,000 for 600 sq. ft.) are often lower than acquiring new property, especially with prefab options or conversions. Investors boost cap rates by adding units that generate $18,000–$36,000 annually in rent, far outweighing the $2,500–$3,750 annual property tax increase. Multigenerational families save on caregiving or housing costs, keeping loved ones close. Programs like Santa Cruz County’s ADU Forgivable Loan offer up to $40,000 for affordable rentals, easing upfront costs.

Step 9: Bringing It All Together

Months after breaking ground, your ADU stands complete—a tucked-under parking unit with cars parked above, a vibrant above-garage studio, or a carport-turned-cottage. Families gather in the new space, sharing laughter over dinner, while investors smile at lease agreements boosting their portfolio. California’s ADU laws have turned your property into a hub of connection and opportunity, blending old and new in a legacy of smart design and financial growth.